For the needs of the company “KELAG Austria”, Elektroobnova built a 35kV voltage power transmission line and an optical subterranean line in the length of cca 17 km. The transmission line is constructed of steel grid columns of height from h = 12 m to h = 23 m. The route of the power transmission line was built on a move from HPP Novakovic through the Ugar valley to the TS 35 kV Knezevo. The power transmission line was built for the purpose of connecting the HPP Novakovic to the transmission system.
Elektroobnova, with great effort, successfully implemented the Contract within the stipulated deadline, regardless of all the obstacles and difficulties that had arisen during the construction. The route of the power transmission line went through an extremely demanding terrain, which is normal for such projects.