The agreement encompasses the construction of two 110 kV transformer fields (110/20/10 kV transformer units with a capacity of 2×20 MW), two 110 kV transmission lines field and one spare field, one measuring field, construction of a control and power plant with a MV 20 kV facility, command-control-protection plant, implementation of SCAD system, telecommunication equipment, as well as TS integration into the electricity transmission network that will contribute to safe, stable and reliable supply of consumers of the Municipality of Sipovo. The substation is connected to the reconstructed 110 kV transmission line Mrkonjic Grad – Sipovo.
Elektroobnova, as the leader of the consortium, conducted the implementation of the entire Contract, according to the “Turnkey” principle, from the beginning of implementation to obtaining an operating license. Modern technical means and trained workforce were used, and state-of-the-art and reliable equipment was installed according to world standards.